South DakotaDepartment of Transportation
Transportation
Aviation
About Office of Aeronautics Services
Office of Aeronautics Services
Airports Conference
Aerospace Education
Airport Information
Links
Aviation Systems Plan
Bridges
Office of Bridge Design
Design & Plans
Historical Bridges
Inventory & Inspection
Posted Structures
Reference Information
SD Bridge Photos
Doing Business
Certification & Accreditation
About Certification & Accreditation
SDDOT Accreditation Certification List
Approved Products
Manuals & Documents
Welding Certifications
Training
Contractors
Bid Letting Information
Concrete Pipe Release
Contractors/Suppliers
Prequalified Contractors
CMS Web Reports
Disadvantaged Business Enterprise (DBE)
Fuel Price Index
Labor Compliance
Materials
Preconstruction Meetings
Price Adjustment Guidelines
Standard Specifications
Subcontract Requirements
Forms & Documents
Webinars
Alternative Contracting
Engineering/Design Services
Consultant Services
Downloadable Files
Manuals
News & Updates
Right of Way / Relocation Assistance
Standard Bid Items
Standard Plates
Surveyors
Utility Coordination
Environmental
About Environmental
Agreements
Endangered Species
Environmental Assessments
Forms
Stormwater
Wetland Mitigation
Local Governments
About Local Governments
Bridge Improvement Grants
City/County Fund Balances
Emergency Relief (ER)
Federal Bridge Program
Forms & Documents
Secure Accounts Billing
Transportation Economic Development Grants
Urban Systems
Rural Access Infrastructure Fund Program
Traffic Incident Management
Training
Projects & Studies
Planning
Carbon Reduction Strategy
Freight Plan
Long Range Plan
Metropolitan Planning Organization
Non-state Public Road Inventory
Pavement Condition Monitoring
Pavement Management
South Dakota EV Fast Charging Plan
Statewide Transportation Improvement Program – STIP
Transportation Asset Management Plan (TAMP)
Inside SDDOT
Forms & Publications
Brochures
Forms
Manuals
Maps
Newsletters
Reports
SDDOT Engagement Opportunities
Join One of Our Contact Lists
Press Releases
Media Kits
News Stories
Branding and Identity Guidelines
Learn More about the SDDOT Logo
SDDOT Blog
Bulletin Board Requirements
Bulletin Board Requirements
The appropriate posters are to be posted by the prime contractor. The posters MUST be displayed on a weatherproof bulletin board in a conspicuous and accessible location to the employees who are working at the construction project site. In addition, each subcontractor whose subcontract is $10,000 or more is required to post the EEO #7 poster. The appropriate posters are provided to the prime contractors at the SDDOT's pre-construction meetings. Most of the posters are available in English and in Spanish. If additional or replacement posters are needed for a bulletin board, please contact the DOT Project Engineer whose name and phone number are listed in the SDDOT's pre-construction minutes that are provided to each prime contractor. Below are the bulletin board poster requirements for the various types of South Dakota Department of Transportation's (SDDOT's) highway construction or repair projects:
Non-Federal-funded construction contracts awarded for $100,000 or more:
- U.S. DOL Davis-Bacon Wage Decision poster, go to SDDOT Wage Requirements page
- WH-1321 Davis-Bacon Employee Rights (English, Revised Oct-2017) [formerly FHWA-1495 "Important" poster]
- WH-1321 Davis-Bacon Employee Rights (Spanish, Revised Oct-2017)
- Equal Employment Opportunity Commission Know Your Rights (English)
- Equal Employment Opportunity Commission Know Your Rights (Spanish)
- Job Safety & Health Protection (OSHA-3165-English, Rev-2015); older versions acceptable
- Job Safety & Health Protection (OSHA-3167-Spanish, Rev-2015); older versions acceptable
- WH-1462 Employee Polygraph Protection Act (see 1462 links below)
- *WH-1420 Your Rights Under the Family Medical Leave Act (see *1420 note and links below)
Federal-aid construction contracts exceeding $2,000:
- U.S. DOL Davis-Bacon Wage Decision poster, go to SDDOT Wage Requirements page
- WH-1321 Davis-Bacon Employee Rights (English, Revised Oct-2017) [formerly FHWA-1495 "Important" poster]
- WH-1321 Davis-Bacon Employee Rights(Spanish, Revised Oct-2017)
- FHWA-1022 "Notice" poster (English, Revised May-2015) Whoever knowingly makes any false statement or false representation or false claim in any statement, certificate or report; shall be fined under Title 18 USC Section 1020 or imprisoned not more than five years, or both.
- FHWA-1022 "Notice" poster (Spanish, Revised May-2015)
- Equal Employment Opportunity Commission Know Your Rights (English)
- Equal Employment Opportunity Commission Know Your Rights (Spanish)
- EEO #7 (EEO Policy Statement & Company EEO Officer) (Revised September-2022)
- Job Safety & Health Protection (OSHA-3165-English, Rev-2015); older versions acceptable
- Job Safety & Health Protection (OSHA-3167-Spanish, Rev-2015); older versions acceptable
- WH-1462 Employee Polygraph Protection Act (English, Revised February-2022)
- WH-1462 Employee Polygraph Protection Act (Spanish, Revised February 2022)
- *WH-1420 Your Rights Under the Family Medical Leave Act (English, Revised Apr-2023) older versions acceptable
- *WH-1420 Your Rights Under the Family Medical Leave Act (Spanish, Revised Apr-2023) older versions acceptable
* 1420 poster is not commonly required to be posted on project site bulletin boards. If a company employs more than 50 employees and 50 or more employees of this company are working within 75 miles of the project site, this poster is required to be posted. If your company meets this requirement, please print and post the WH-1420 poster on the project bulletin board.
Certification & Accreditation
About Certification & Accreditation
SDDOT Accreditation Certification List
Approved Products
Manuals & Documents
Welding Certifications
Training
Contractors
Bid Letting Information
Concrete Pipe Release
Contractors/Suppliers
Prequalified Contractors
CMS Web Reports
Disadvantaged Business Enterprise (DBE)
Fuel Price Index
Labor Compliance
Engineering/Design Services
Bulletin Board Requirements
Certified Payrolls- let before 6/5/19
Certified Payrolls - let after 6/5/19
Davis-Bacon Wage Requirements and Defined Work Classifications
Materials
Preconstruction Meetings
Price Adjustment Guidelines
Standard Specifications
Subcontract Requirements
Forms & Documents
Webinars
Alternative Contracting
Consultant Services
Downloadable Files
Manuals
News & Updates
Right of Way / Relocation Assistance
Standard Bid Items
Standard Plates
Surveyors
Utility Coordination
Environmental
About Environmental
Agreements
Endangered Species
Environmental Assessments
Forms
Stormwater
Wetland Mitigation
Local Governments
About Local Governments
Bridge Improvement Grants
City/County Fund Balances
Emergency Relief (ER)
Federal Bridge Program
Forms & Documents
Secure Accounts Billing
Transportation Economic Development Grants
Urban Systems
Rural Access Infrastructure Fund Program
Traffic Incident Management
© 2025 State of South Dakota. All Rights Reserved.
South Dakota Department of Transportation
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Powered by:
Modern Logic
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
South Dakota Department of Transportation
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Powered by:
Modern Logic
Modern Logic