Bridge Reconstruction Scheduled to Begin at Cheyenne River Bridge South of Maverick Junction on S.D. Highway 18
For Immediate Release:
Friday, May 17, 2024
Contact:
Matt “Rip” Rippentrop, Project Engineer, 605-673-9016
Â
HOT SPRINGS, S.D. – On Tuesday, May 28, 2024, a bridge rehabilitation project is scheduled to begin at the Cheyenne River Bridge one mile south of Maverick Junction on S.D. Highway 18.
Traffic will be moved to the eastbound lanes and reduced to two-way traffic with a twelve-foot width restriction and reduced speed limits in effect until mid-August 2024. This project will then repair the westbound bridge’s abutment and approach slab.Â
The prime contractor on the $1.2 million project is J.V. Bailey Company, Inc. from Rapid City, SD. The project completion date is Friday, Oct. 4, 2024.
About SDDOT:
The mission of the South Dakota Department of Transportation is to efficiently provide a safe and effective public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov.
-30-
© 2026 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2026 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic