South DakotaDepartment of Transportation
Transportation
Aviation
About Office of Aeronautics Services
Office of Aeronautics Services
Airports Conference
Aerospace Education
Airport Information
Links
Aviation Systems Plan
Bridges
Office of Bridge Design
Design & Plans
Historical Bridges
Inventory & Inspection
Posted Structures
Reference Information
SD Bridge Photos
Doing Business
Certification & Accreditation
About Certification & Accreditation
SDDOT Accreditation Certification List
Approved Products
Manuals & Documents
Welding Certifications
Training
Contractors
Bid Letting Information
Concrete Pipe Release
Contractors/Suppliers
Prequalified Contractors
CMS Web Reports
Disadvantaged Business Enterprise (DBE)
Fuel Price Index
Labor Compliance
Materials
Preconstruction Meetings
Price Adjustment Guidelines
Standard Specifications
Subcontract Requirements
Forms & Documents
Webinars
Alternative Contracting
Engineering/Design Services
Consultant Services
Downloadable Files
Manuals
News & Updates
Right of Way / Relocation Assistance
Standard Bid Items
Standard Plates
Surveyors
Utility Coordination
Environmental
About Environmental
Agreements
Endangered Species
Environmental Assessments
Forms
Stormwater
Wetland Mitigation
Local Governments
About Local Governments
Bridge Improvement Grants
City/County Fund Balances
Emergency Relief (ER)
Federal Bridge Program
Forms & Documents
Secure Accounts Billing
Transportation Economic Development Grants
Urban Systems
Rural Access Infrastructure Fund Program
Traffic Incident Management
Training
Projects & Studies
Planning
Carbon Reduction Strategy
Freight Plan
Long Range Plan
Metropolitan Planning Organization
Non-state Public Road Inventory
Pavement Condition Monitoring
Pavement Management
South Dakota EV Fast Charging Plan
Statewide Transportation Improvement Program – STIP
Transportation Asset Management Plan (TAMP)
Inside SDDOT
Forms & Publications
Brochures
Forms
Manuals
Maps
Newsletters
Reports
SDDOT Engagement Opportunities
Join One of Our Contact Lists
Press Releases
Media Kits
News Stories
Branding and Identity Guidelines
Learn More about the SDDOT Logo
SDDOT Blog
Tribal Relations (TERO)
Tribal Relations (TERO)
Information about the 2024 Tribal Transportation Safety Summit is posted below.
2024 Tribal Transportation Safety Summit Information
The 2024 Tribal Transportation Safety Summit was held Tuesday-Wednesday, Oct. 29-30, 2024, at the Royal River Casino & Hotel in Flandreau, SD. There was also a Road Maintenance Training on Wednesday, Oct. 29, 2024, in conjunction with the Summit. The Summit report will be posted in early 2025.
2024 SDDOT Summit Report - Final with Appendices
Previous Summit Reports
-
2023 SD Tribal Transportation Saftey Summit Report
2023 Summit Report Appendices - October 2019 Tribal Transportation Safety Summit Report
2019 Summit Report Appendices - October 2018 Tribal Transportation Safety Summit Report
- October 2017 Tribal Safety Summit Report
- October 2016 Tribal Transportation Safety Summit Report
- October 2015 Tribal Transportation Safety Summit Report
- October 2014 Tribal Transportation Safety Summit Report
- January 2014 Tribal Transportation Safety Summit Report
- 2012 Tribal Transportation Safety Summit Report
TERO / TECRO Information
Some projects have a special provision for TERO in their contracts. This provision applies to projects within the legal or historic boundaries of Indian Reservations.
The Special Provisions can vary slightly depending on the location of the project and scope of work. They can include some or all of the following: an Indian Preference Hiring Goal, TERO Employment Fee, Other Special Fees and/or a need for Compliance Plan to be negotiated between the Contractor and the Tribe.
When a project is let, a letter is sent to the Contractor and the Tribal TERO office notifying them of the Special Provision requirements and whether a Compliance Plan is needed.
Compliance plans are specific to each tribe and MUST be submitted to the correct tribal office prior to beginning work on a project which is on Reservation land. In some cases, the compliance plan may need to be submitted two (2) weeks before work on the project begins.
The Special Provisions can vary slightly depending on the location of the project and scope of work. They can include some or all of the following: an Indian Preference Hiring Goal, TERO Employment Fee, Other Special Fees and/or a need for Compliance Plan to be negotiated between the Contractor and the Tribe.
When a project is let, a letter is sent to the Contractor and the Tribal TERO office notifying them of the Special Provision requirements and whether a Compliance Plan is needed.
Compliance plans are specific to each tribe and MUST be submitted to the correct tribal office prior to beginning work on a project which is on Reservation land. In some cases, the compliance plan may need to be submitted two (2) weeks before work on the project begins.
- Cheyenne River Sioux Tribe Compliance Plan
- Crow Creek Sioux Tribe Compliance Plan
- Sisseton-Wahpeton Oyate Tribe Compliance Plan
- Rosebud Sioux Tribe Compliance Plan
- Yankton Sioux Tribe Compliance Plan
- Oglala Sioux Tribe Compliance Plan
- Standing Rock Sioux Tribe Compliance Plan
- Lower Brule Sioux Tribe Compliance Plan
Contact Information for TERO and TECRO Offices in South Dakota
175
June Hansen
Civil Rights Compliance Officer / ADA Coordinator
605-773-3540
© 2025 State of South Dakota. All Rights Reserved.
South Dakota Department of Transportation
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Powered by:
Modern Logic
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
South Dakota Department of Transportation
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Powered by:
Modern Logic
Modern Logic