U.S. Highway 14 - From Philip East Eight Miles



Project Summary:

This project will replace three structures, two box culverts, and construct one new bridge.

Approach grading and pipe replacement will also be included on the project. 

Traffic is rerouted around the work area using the temporary diversions so crews can conduct structure and grading work. Traffic diversions will remain in place for the majority of the 2024 construction season. The first phase of work is expected to be completed on Friday, Oct. 25, 2024, with work resuming in spring 2025.  

Project Timeline:

March 18, 2024 - Nov. 2025

Project Updates:

Dec. 2, 2024: 

Oct. 15, 2024 – Nov. 15, 2024, Completed Work: Grading and pipe installation at the sites located one and one-half miles and four and one-half miles east of Philipis near completionConstruction on the box culvert located one and one-half miles east of Philip was completedConstruction on the bridge located four and one-half miles east of Philip was completedErosion control work was mostly completed on the sites one and one-half miles and four and one-half miles east of PhilipClass HR paving was completed on the sites one and one-half miles and four and one-half miles east of Philip. 

Anticipated work  Nov. 15, 2024 – Dec. 15, 2024 General project cleanup will continue on the projectGuardrail installation and permanent pavement markings will be installedThe project will be opened up to through trafficWork will commence next spring. 

 

Project Photos:

 

 


Project Contract Amount:

$16.7 Million

Project Contacts:

SDDOT: 
Zane Schlabach
605-842-0810

Contractor:
Perrett Construction
Valentine, NE
402-376-3797